Vision Energy delivered a full energy consultancy package for a 93-unit residential development, covering SAP Calculations, overheating analysis under CIBSE TM59, and air tightness testing coordination. Overheating was identified as a key risk at an early stage given the south-facing elevations and glazing ratios.