← Our Work

Residential Development of 93 Apartments

United Kingdom 2024 93 apartments Private Developer
Services SAP Calculations, Overheating Analysis, Air Tightness

Project Overview

Vision Energy delivered a full energy consultancy package for a 93-unit residential development, covering SAP Calculations, overheating analysis under CIBSE TM59, and air tightness testing coordination. Overheating was identified as a key risk at an early stage given the south-facing elevations and glazing ratios.

Services Delivered

  • SAP Calculations for all 93 apartments
  • Overheating analysis to CIBSE TM59
  • Air tightness testing strategy and coordination
  • MVHR specification support
  • External shading design support
  • As-built EPCs for all units

Outcomes

  • All units passed TM59 overheating criteria
  • Average EPC Band B across the development
  • Air tightness testing achieved target permeability across all units
  • Overheating risk eliminated without significant increase in cost