← Our Work

Colville Estate Phase 2C – Blocks C & E

Hoxton, London 2025 93 apartments
Services New Build SAP Calculations, CIBSE TM59 Overheating Assessments, IES Dynamic Thermal Modelling

Project Overview

Vision Energy were commissioned to undertake SAP calculations and CIBSE TM59 overheating assessments for Blocks C and E of the Colville Estate Phase 2C regeneration scheme in Hoxton, London. The development forms part of the London Borough of Hackney's wider regeneration programme, delivering 93 new mixed-tenure homes alongside community facilities and improved public spaces. Our SAP assessments evaluated the proposed dwellings against Part L 2013 requirements, considering building fabric performance, glazing, airtightness and communal heat-pump heating systems. Detailed dynamic thermal modelling was also undertaken using IES Virtual Environment to assess summertime overheating risk and thermal comfort within the residential accommodation. The design-stage SAP assessments demonstrated compliance with the applicable carbon emissions and fabric energy efficiency targets across the assessed dwelling types in both blocks.

Services Delivered

  • New Build SAP Calculations
  • CIBSE TM59 Overheating Assessments
  • IES Dynamic Thermal Modelling

Outcomes

  • Part L 2013 compliance demonstrated across the assessed dwelling types in Blocks C and E.
  • Detailed 3D thermal models developed to assess summertime overheating risk.
  • Energy and thermal comfort assessments provided to support the design and regulatory compliance process.