The centre includes a cafe, function room, and wudu room, providing ablution facilities for Muslim prayer. Along with a BMX pump track and cyclo-cross track, the facility also boasts a cycle hub offering bike maintenance and repairs workshops.
Vision were instructed to undertake the as-built SBEM calculations to display compliance with Approved Document Part L, The development utlilised low carbon heating in the form of Air Source Heat Pumps, Solar PV.
The building achieved a 46% reduction in C02 emissions compared to Part L and an EPC rating of A14.
Total kgC02/m2 Per Annum :31.57
Total kWh/m2 Per Annum :255
Total Solar PV kWh/m2 Per Annum :22.35
Final EPC rating :A14